Friday, November 13, 2009

Ballasting, more track work, placement of rock castings, and road crossings.

HPIM0830 This is Carola’s handiwork at Ballasting






HPIM0826

The tricky part of using two different sizes of track is connecting them together…

Here I used code 55 in the industry spot and code 80 for the main line.






HPIM0829

Placing hydrocal castings on the foam and sealing the edges with foam putty.






HPIM0827

Using foam putty for road crossings.









HPIM0828

The roadway bridges will be placed in the painted area.

No comments:

Post a Comment